사례연구/전기.전자
2010/05/19 22:52
A single simulation saved about £5 million by helping engineers develop a more efficient printed circuit board manufacturing process that eliminated the need for a third shift. Spreadsheet analysis originally showed that three shifts would be required to meet the manufacturing schedule to build new processors for the switch that serves as the backbone of the AT&T network. Hoping to improve the process, Lucent Technologies engineers performed a WITNESS simulation that provided a much more realistic model of the process and allowed them to quickly and inexpensively evaluate a wide range of alternatives. Working with the simulation, Lucent engineers improved routing logic and test mixtures and made other changes that increased productivity by about 50% without any additional expenditures.
'사례연구 > 전기.전자' 카테고리의 다른 글
| Simulating Fab Business Improvement at BAE SYSTEMS (0) | 2010/05/19 |
|---|---|
| Brammer PLC deploy the power of WITNESS throughout their Supply Chain (0) | 2010/05/19 |
| Lanner Saves £100,000 for Cabletec (0) | 2010/05/19 |
| WITNESS Helps HP Improve Inkjet Handling Process (0) | 2010/05/19 |
| WITNESS Saves £5 Million for Lucent (0) | 2010/05/19 |
| Motorola Boosts Distribution Centre Productivity (0) | 2010/05/19 |
TAG
simulation
Lucent Technologies.pdf