사례연구/금융.병원.콜센터
2010/05/19 21:44
A $147 million facility renovation plan at Sarasota Memorial Hospital sparked an effort to ensure that the newly designed/renovated space would be both effective and functional. Effectively, the space would meet business and operational goals while functionally optimizing the square footage available. Simulation was used to test department design at the blueprint stage. Clarifying operational objectives, gathering and summarizing data into a concise form, and testing the design through simulation, resulted in a project, which realized tremendous savings in construction and operational costs, and improved the patient process.
'사례연구 > 금융.병원.콜센터' 카테고리의 다른 글
| Agent Seating Optimisation within a Contact Centre (0) | 2010/05/19 |
|---|---|
| LANNER and WITNESS deliver for MADAME TUSSAUDS (0) | 2010/05/19 |
| Business Improvement in Insurance Claims at (0) | 2010/05/19 |
| New Hospital Design at Sarasota Memorial Hospital, USA (0) | 2010/05/19 |
| Sheffield Teaching Hospitals NHS Trust Secure Additional Funding! (0) | 2010/05/19 |
| Vertex Make the Right call (0) | 2010/05/18 |
TAG
simulation
Sarasota Memorial Hospital, USA.pdf